{"id":18417,"date":"2022-02-11T17:15:55","date_gmt":"2022-02-12T01:15:55","guid":{"rendered":"https:\/\/wou.edu\/westernhowl\/?p=18417"},"modified":"2022-02-11T17:24:13","modified_gmt":"2022-02-12T01:24:13","slug":"construction-craziness-continues","status":"publish","type":"post","link":"https:\/\/wou.edu\/westernhowl\/construction-craziness-continues\/","title":{"rendered":"Construction Craziness Continues"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.14.1&#8243; _module_preset=&#8221;default&#8221; custom_padding=&#8221;0px|||||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row _builder_version=&#8221;4.14.1&#8243; _module_preset=&#8221;default&#8221; custom_padding=&#8221;0px|||||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.14.1&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_text _builder_version=&#8221;4.14.1&#8243; _module_preset=&#8221;default&#8221; width=&#8221;100%&#8221; min_height=&#8221;961.8px&#8221; custom_padding=&#8221;|2px|0px|||&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<p><!-- divi:tadv\/classic-paragraph --><em>Western continues phase 2 of construction on Monmouth Avenue<\/em><\/p>\n<p><span><strong>Mikayla Coleman <\/strong>| News Editor<\/span><\/p>\n<p><span style=\"font-weight: 400\">Phase two of construction on Monmouth Avenue is continuing efforts to fix Western\u2019s steam line.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">There was never a plan to have a phase two for this specific project, but because of additional damage that was discovered during the first phase, they had to continue working on the line.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Work on the steam line has taken longer than expected for a myriad of unforeseen circumstances.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Construction was unable to begin until after graduation ceremonies commenced in 2021, even though the project was approved several months before then. The delivery of piping material and critical valves was delayed substantially, around six to eight weeks, due to supply chain issues. There were also change orders \u2014 some of the existing conditions were not fully documented in the existing drawings \u2014 which resulted in the need for more materials, different requirements and an increased project scope.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u201cConstruction work involving utilities services placed in the ground can be slow and unpredictable,\u201d said Mike Elliot, project manager for Capital Planning and Construction. \u201cMost often, the work to be performed is on systems which can be decades old and not always well documented. Because Western is 150 years old, the steam line system has been added to many times in several phases and projects. While all of the information concerning the steam system is available, it has not been collected in a single set of construction drawings. This fact has added to the complexity of completely understanding the total scope of the project.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400\">All the unexpected discoveries have given construction crews the opportunity to address more issues.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u201cOne goal for the final outcome of the steam line repair project is to produce a single set of \u2018as built\u2019 drawings documenting the entire steam line system on campus,\u201d said Elliot. \u201cThis will significantly assist the Facilities Department in the future in providing preventative maintenance of the system ensuring the longevity of the new steam line.\u201d\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Originally due to end in Nov. 2021, the best estimate of when construction will be finished is now April 2022. <\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/wou.edu\/westernhowl\/files\/2020\/12\/lighter-gray-line.png\" alt=\"\" class=\"alignnone size-full wp-image-16738\" width=\"4220\" height=\"82\" srcset=\"https:\/\/wou.edu\/westernhowl\/files\/2020\/12\/lighter-gray-line.png 4220w, https:\/\/wou.edu\/westernhowl\/files\/2020\/12\/lighter-gray-line-300x6.png 300w, https:\/\/wou.edu\/westernhowl\/files\/2020\/12\/lighter-gray-line-1024x20.png 1024w, https:\/\/wou.edu\/westernhowl\/files\/2020\/12\/lighter-gray-line-768x15.png 768w, https:\/\/wou.edu\/westernhowl\/files\/2020\/12\/lighter-gray-line-1536x30.png 1536w, https:\/\/wou.edu\/westernhowl\/files\/2020\/12\/lighter-gray-line-2048x40.png 2048w, https:\/\/wou.edu\/westernhowl\/files\/2020\/12\/lighter-gray-line-1080x21.png 1080w\" sizes=\"(max-width: 4220px) 100vw, 4220px\" \/><\/p>\n<p><span>Contact the author at <span style=\"font-weight: 400\">howlmanagingeditor@wou.edu<\/span><\/span><\/p>\n<p><!-- \/divi:tadv\/classic-paragraph --><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.14.1&#8243; _module_preset=&#8221;default&#8221; custom_margin=&#8221;-259px|auto||auto||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.14.1&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Western continues phase 2 of construction on Monmouth Avenue<\/p>\n<p>Mikayla Coleman | News Editor<\/p>\n","protected":false},"author":1361,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_lmt_disableupdate":"","_lmt_disable":"","_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":"","_links_to":"","_links_to_target":""},"categories":[3],"tags":[],"class_list":["post-18417","post","type-post","status-publish","format-standard","hentry","category-news"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/wou.edu\/westernhowl\/wp-json\/wp\/v2\/posts\/18417","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wou.edu\/westernhowl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wou.edu\/westernhowl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wou.edu\/westernhowl\/wp-json\/wp\/v2\/users\/1361"}],"replies":[{"embeddable":true,"href":"https:\/\/wou.edu\/westernhowl\/wp-json\/wp\/v2\/comments?post=18417"}],"version-history":[{"count":0,"href":"https:\/\/wou.edu\/westernhowl\/wp-json\/wp\/v2\/posts\/18417\/revisions"}],"wp:attachment":[{"href":"https:\/\/wou.edu\/westernhowl\/wp-json\/wp\/v2\/media?parent=18417"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wou.edu\/westernhowl\/wp-json\/wp\/v2\/categories?post=18417"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wou.edu\/westernhowl\/wp-json\/wp\/v2\/tags?post=18417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}